Skip to main content
Plumb/Square
Home/States/California/Solar PV Installer
CAELECTRICALSOC 47-2231PREVAILING WAGE STATE

SOLAR PV INSTALLER

in California

Installs photovoltaic systems on roofs and ground mounts. Growing trade, often a stepping stone to electrician. California is not a right-to-work state — union density is higher than average and prevailing wage rules cover most public projects.

Median pay (national)
$51,860
BLS OEWS May 2024
Top 10%
$78,320
90th percentile
To journeyman
13 yrs
Licensing required
YES
check state board
§ 01

The License.

Licensing board
California Division of Labor Standards Enforcement (DLSE)
Verify license / apply → https://www.dir.ca.gov/dlse/

Most states issue a journeyman license (allows you to work under a licensed contractor) and a separate master or contractor license (allows you to pull permits and run your own business). The journeyman license typically requires completing your apprenticeship and passing a written exam; the master/contractor license requires additional field hours — usually 2 years as a journeyman — and a separate exam.

Requirements in California: confirm current hour and exam requirements directly with California Division of Labor Standards Enforcement (DLSE). Rules update frequently and our data reflects published standards as of early 2025.

§ 02

The Money.

Pay data for this trade in California. BLS metro-level data was not available for this combination. National medians shown below.

StageHourly rangeApprox. annual
Year 1 apprentice$17–$22/hr$34,000$44,000
Journeyman scale$25–$38/hr$50,000$76,000
BLS national median$51,860
BLS top 10%$78,320

California is NOT a right-to-work state. Union scale in California's major metros typically runs 20–40% above the national median. Prevailing wage laws apply to most public-sector projects.

§ 03

The Path.

Apprenticeship length
13 years
2,000 on-the-job hours · 240 classroom hours
Education floor
HS Diploma
Minimum age: 18 · Driver's license: Yes · Drug test: Standard

California does NOT use the federal RAPIDS system. The state's Division of Apprenticeship Standards (DAS) administers all registered apprenticeship programs independently. A RAPIDS-registered apprenticeship from another state may not transfer. Find California programs at dir.ca.gov/das.

Sponsoring unions
  • · IBEW (some classifications)
§ 04

The Exam.

Most states use the NEC (National Electrical Code) as the basis for the journeyman and master electrician exam. California may be on a different NEC edition than the current one — confirm which edition before you study. Pass rates vary significantly: some states run 50–60% first-time pass rates, others run higher. PSI Exams and Prometric administer most state electrical exams. Bring your NEC codebook (tabbed) where allowed. Prevailing wage requirements in California apply to most public-sector projects, which ties exam and licensure to wage scale compliance for contractors.

Be honest about pass rates. Many licensing boards do not publish them. When they do, first-time pass rates for journeyman exams in the trades typically run 50–75%. Preparation time varies — most serious candidates spend 60–120 hours on exam prep. Use code books from the correct edition, not what's currently in print.

§ 05

What recruiters won't tell you.

  1. 01Industry is heavily policy-dependent — tax credits and net metering rules drive demand.
  2. 02Many solar installer jobs are seasonal or project-based, not year-round.
  3. 03Roof work in summer heat is grueling. Stay hydrated.
  4. 04NABCEP certification is the real credential for moving up.
  5. 05California has its own apprenticeship agency (DAS) and does NOT use the federal RAPIDS system. A RAPIDS-registered apprenticeship from another state may not transfer directly.
  6. 06California CSLB licensing is required for any job over $500 in labor and materials. Working unlicensed is a misdemeanor and can result in fines up to $15,000.